Why Transmission Expansion Matters for South Africa’s Next Wave

Utility-scale solar and other grid-connected generation need a network that can connect and move electricity reliably. This explainer separates the generation pipeline, transmission procurement, project connection and physical delivery.

Published: November 2, 2026    Written by: Wesley Palm
START READING
Wesley Palm

LUMAX - OPERATIONS MANAGER

Transmission expansion matters because utility-scale solar and other grid-connected generation can only reach wider demand when the network can connect and move that electricity reliably. A strong generation pipeline and a stronger grid are complementary. They are not the same programme, and each project still has its own development, connection and delivery path.

This distinction is becoming more important in South Africa. On 1 October 2026, the Department of Electricity and Energy and National Treasury confirmed the next phase of the Independent Transmission Projects Programme. Government described transmission as a key enabler of new generation and said the pace of network expansion will increasingly influence how quickly new generation investment can connect.

Eight days later, Eskom launched a Request for Qualification for strategic partners for an initial portfolio of up to 6 GW of utility-scale renewable energy and storage projects. Eskom said its contribution would include at least 2 GW of solar PV and 1 GW / 4 GWh of battery storage.

These are meaningful signals, but they should be read carefully. The transmission programme is still moving through procurement. The Eskom process is an RFQ, not a 6 GW project award or a construction notice. Together, the announcements show why generation, grid capacity and physical project delivery need to advance as connected but separate workstreams.

Four linked stages
From pipeline to power system

Four linked stages

A generation announcement is not the same as a connected project.

1

Generation pipeline

Policy, procurement and development create potential new supply.

2

Transmission capacity

The network needs suitable capacity and infrastructure to move electricity.

3

Project connection

Each project still requires its own connection process, approvals and programme.

4

Physical delivery

Generation sites and structures must be engineered and built for their actual conditions.

Transmission is the link between generation and demand

A solar plant produces electricity at a specific location. The transmission network moves large volumes of electricity between generation areas, substations and centres of demand. If suitable network capacity and connection infrastructure are not available, a technically sound generation project may still face delays, constraints or additional network work before it can export electricity.

That does not make solar less relevant. It means energy planning must consider both sides of the system. South Africa needs new generation, while also investing in the network, storage, system flexibility and the processes needed to connect projects responsibly.

What the Independent Transmission Projects Programme changes

The Independent Transmission Projects Programme introduces private-sector participation as an additional route for developing national transmission infrastructure. It complements public investment by the National Transmission Company South Africa rather than replacing it.

Government’s October update says Phase I comprises approximately 1,164 kilometres of new transmission infrastructure. A second draft Request for Proposals package is expected before the end of 2026, followed by further consultation and approvals. The final RFP is targeted for the second quarter of 2027.

The dates describe a procurement pathway, not completed infrastructure. Their value is that they provide a clearer view of the work underway to expand delivery capacity and create a repeatable route for future transmission investment.

Why this matters to solar developers and EPCs

Transmission planning affects where and when utility-scale renewable projects can progress, but a national announcement does not answer every project question. Connection applications, available capacity, network studies, environmental processes, land, commercial arrangements, and programme dependencies remain project-specific. Developers and EPCs therefore need to distinguish between three distinct levels of information:

  • Policy & Procurement Announcements: Indicate overall strategic direction and market intent.

  • Project Connection Processes: Establish the specific network pathway for a single development.

  • Detailed Design & Delivery: Turn an approved project basis into physical infrastructure on the ground.

Two solar developers looking at an array of solar mounting structures

Where mounting structures fit

Transmission investment enables more generation to connect, but it does not remove the need for disciplined site engineering. When a solar project moves toward implementation, its mounting solution still has to suit the actual terrain, layout, module selection, environmental conditions, foundation strategy and construction programme.

This is where the market story becomes a project-delivery story. Grid expansion can open opportunity at system level. The mounting structure helps turn a defined solar layout into a buildable asset at site level. Neither substitutes for the other.

For Lumax, the responsible position is not to claim involvement in announced programmes. It is to remain ready to support EPCs, developers and asset owners when specific projects reach the stage where verified structural inputs and appropriate mounting solutions are required.

Storage and curtailment are part of the same system discussion

On 7 October 2026, the Department of Electricity and Energy said the first proposed section 34 determination under the Integrated Resource Plan 2025 would prioritise battery storage and gas-to-power, with solar and wind to be addressed in a subsequent determination. The Department linked the sequence to flexibility, system requirements and curtailment.

This should not be read as a conclusion that new solar is unnecessary. Storage can shift electricity to more useful periods, while transmission can move electricity across the network. New generation, storage and grid expansion perform different functions and need coordinated planning.

What should the market watch next?

Moving forward, the most critical industry signals to monitor will be:

  • Procurement Milestones: Formal progress updates and finalized RFP releases for transmission.

  • Capacity & Network Plans: Updated grid allocation figures and connection-capacity data.

  • Project Velocity: Evidence of projects advancing through approvals toward financial close and construction.

Frequently asked questions

Is Eskom’s up to 6 GW programme already awarded?

No. Eskom’s October announcement concerns an RFQ to establish a panel of pre-qualified strategic partners. Future opportunities remain subject to project-specific procurement, evaluation and approvals.

Why does transmission matter to a mounting-structure specialist?

Transmission helps create the system conditions for new generation to connect. When individual solar projects progress, they still require site-specific physical design and delivery, including mounting structures that suit the approved project basis.

South-African flag waving in the wind

The opportunity is larger than one announcement

South Africa’s solar opportunity depends on more than a generation target. It depends on the grid, connection processes, storage, finance and the practical ability to deliver projects on the ground. Progress in transmission is therefore positive for the sector, provided announcements are translated into credible procurement, completed infrastructure and connectable projects.

Planning a solar project?

  • Share the project location, parking layout, PV module datasheet and required vehicle clearance with Lumax Energy.
  • Our team can help identify the appropriate product information for the next stage of design.